Our
Projects

  • WOOMERA KOOLYMILKA PIPELINE REMEDIATION WORKS

    The Woomera Koolymilka Pipeline supplies water from Woomera township to the Range E headquarters. The Pipeline remediation project was undertaken while maintaining water supply to Range E during construction activities.

  • CULTANA TRAINING AREA (CUTA) ROAD REMEDIATION

    The primary scope of work for the Cultana Road Remediation project is a 5.5km road through hilly terrain to connect Sentry Point 1 with Sentry Point 2, a vital access route from the entry to the training area.

  • WOOMERA RANGE ROADS RE-SHEETING AND MAINTENANCE

    The Woomera roads re-sheeting project involved the design and construction of 84.7Km of sealed and unsealed road networks at Woomera Range E. Works aim to upgrade existing infrastructure at Woomera to facility Defence training.

  • BRADSHAW FIELD TRAINING AREA 3 YEAR ROAD WORKS

    WSU Civil was engaged to complete various maintenance and improvement road works. The works consisted of rehabilitation of existing road pavement, construction of heavy duty pavement, installation of new concrete floodways and sealing pavement.

  • WOOMERA RANGE LAUNCHER PAD REMEDIATION

    This project involved remediation of reinforced concrete pads at Launch Area 1 and Launch Area 2, Woomera Range, South Australia.

  • CULTANA TRAINING AREA 3 YEAR ROAD WORKS

    The primary scope of work for the Cultana Training Area Roadworks project is road (11.5km) and drainage/culvert construction to ensure a fit for purpose structure. The site is situated in the Australian Army Cultana Training Area adjacent to Lincoln Highway and Port Bonython Road, Whyalla, South Australia.

  • ASMTI FACILITIES PROJECT SHOALWATER BAY TRAINING AREA CIVIL WORKS - STAGE 14 UOLF v WESTERN CIVILS & STAGE 3 ACCESS ROADS

    WSU Civil were contracted by Laing O’Rourke to undertake the civil works on the ASMTI SWBTA Stage 3 Access Road and Stage 14 Urban Operation Live Firing (UOLF) Training Area.

  • LAND 4502 PAD WEST PFAS STOCKPILE AND ROAD WORKS

    Lendlease awarded WSU Civil the Land 4502 PFAS Management package at the RAAF Base, Townsville. Works involved the bulk excavation of 20,000m3 of contaminated materials, treating as required, placing the material onto a pad and compacting.

  • SCHERGER FENCING, CREEK WORKS & UNSEALED ROAD

    Barpa awarded WSU Civil the civil works package involving the replacement of perimeter boundary fencing and construction of floodway infrastructure at RAAF Base Scherger located near Weipa in QLD.

  • LAND 155 WP2 LAVARACK BARRACKS - CIVIL WORKS

    The LAND 155 WP2 project involved the construction of new shelters and hardstand at Holsworthy Barracks, Camp Sapper Liverpool in NSW, Wallangarra Barracks in SEQ and Lavarack Barracks in North QLD.

  • LAND 121 STAGE 2 UNIT SUSTAINMENT FACILITIES

    WSU Civil were contracted by Shamrock Civil Engineering to undertake the construction of inground stormwater pipes and open vee drains for the Lavarack Barracks Townsville LAND 121 project.